Points to Remember:
- The problem involves calculating the surface area of a hemisphere.
- Unit conversion is crucial (meters to centimeters).
- The cost calculation requires multiplying the surface area by the cost per unit area.
Introduction:
This question requires a factual and analytical approach to determine the cost of painting a hemispherical dome. We are given the circumference of the base of the dome and the cost of painting per 100 cm². To find the total cost, we first need to calculate the surface area of the hemisphere and then convert the units to ensure consistency before performing the cost calculation. The formula for the surface area of a sphere is 4Ïr², where ‘r’ is the radius. Since we are dealing with a hemisphere, we will use half of this value.
Body:
1. Calculating the Radius:
The circumference of the base (which is a circle) is given as 17.6 meters. The formula for the circumference of a circle is 2Ïr. Therefore:
2Ïr = 17.6 m
r = 17.6 m / (2Ï) â 2.8 m
Converting meters to centimeters:
r â 2.8 m * 100 cm/m = 280 cm
2. Calculating the Surface Area:
The surface area of a hemisphere (excluding the base) is given by 2Ïr². Substituting the value of ‘r’:
Surface area = 2Ï(280 cm)² â 492600 cm²
3. Calculating the Total Cost:
The cost of painting is â¹5 per 100 cm². To find the total cost, we divide the total surface area by 100 and then multiply by the cost per 100 cm²:
Total cost = (492600 cm² / 100 cm²) * â¹5 = â¹24630
Conclusion:
In summary, the total cost of painting the hemispherical dome is â¹24630. This calculation involved determining the radius from the given circumference, calculating the surface area of the hemisphere, and then using the provided cost per unit area to arrive at the final cost. This approach ensures accuracy and clarity in solving the problem. While this calculation is straightforward, it highlights the importance of accurate measurements and unit conversions in practical applications, ensuring efficient resource allocation in projects like building maintenance and painting. Future projects should emphasize precise measurements and detailed cost estimations to avoid unexpected expenses and ensure project success.
MPPCS Notes brings Prelims and Mains programs for MPPCS Prelims and MPPCS Mains Exam preparation. Various Programs initiated by MPPCS Notes are as follows:-- MPPCS Mains 2025 Tests and Notes Program
- MPPCS Prelims Exam 2025- Test Series and Notes Program
- MPPCS Prelims and Mains 2025 Tests Series and Notes Program
- MPPCS Detailed Complete Prelims Notes 2025